"DIAGRAM","standard 12 ton wagon details of framing ironwork LNER 1923","D",402,"" "DIAGRAM","standard 12 ton wagon details of iron castings LNER 1923","D",403,"" "DRAWING","Bridgwater Railway Goods Shed at Edington scaled N Pankhurst","D",4602,"" "DRAWING","Bridgwater Railway Station Building at Edington scaled N Pankhurst","D",4603,"" "DRAWING SDJR","Wells Branch No 9 at Highbridge 10/1987 ½"" to 1'","D",4601,"" "DRAWINGS","Bute Works Supply Co details of rail supplied October 1891","D",700,"" "DRAWINGS Bridgwater Railway","5 original drawings of buildings etc at Bridgwater drawn by Neil Pankhurst for The Bridgwater Railway by J B Harrisin Oakwood 1990","D",810,"" "DRAWINGS SDJR 2-8-0 locomotive","five for cylinders 7F 1924/1925 Derby E122","D",4710,"" "DRAWINGS SDJR Locomotive 7F 2-8-0","fittings set of eight","D",4711,"" "DRAWINGS SDJR Locomotive 7F 2-8-0","for cylinders 1924/25 Derby E122 set of five (copies)","D",4710,"" "MR","distance diagram S & D J R Sh.60 Bath & Radstock 1917","D",120,"" "MR","distance diagram S & D J R Sh.61 Glastonbury & Wells 1918","D",121,"" "MR","distance diagram S & D J R Sh.62 Bridgwater & Highbridge 1919","D",122,"" "MR","distance diagram S & D J R Sh.63 Templecombe 1919","D",123,"" "MR","distance diagram S & D J R Sh.64 Blandford 1919","D",124,"" "MR","distance diagram S & D J R Sh.65 Broadstone & Bournemouth 1919","D",125,"" "MR","distance diagram Templecombe 1919","D",126,"" "MR SDJR LSWR","map The Somerset and Dorset Railway Extension uniting the Midland Railway with the LSWR nd photograph Science Museum 1392/85","D",127,"a" "ORDNANCE SURVEY MAPS","1"" to 1 mile set of 5 covering S&D: 179 (1940) Bournemouth; 130 (1941) Yeovil & Blandford; 121 (1940) Shepton Mallet; 111 (1940) Bath & Bristol; (1929) Weston super Mare ","D",8000,"" "PLAN","& agreement S&D at Cole W.H. Carver 1905","D",203,"" "PLAN","Admiralty sidings between Bailey Gate and Wimborne.","D",1158,"" "PLAN","Application to lay pipe over bridge#169.","D",1224,"" "PLAN","Ashcott. Signal diagram.","D",2066,"" "PLAN","Bailey Gate Crossing. Locking plan.","D",2050,"" "PLAN","Bailey Gate road box store 1918","D",28,"" "PLAN","Bailey Gate Station.","D",1162,"" "PLAN","Bailey Gate Station.","D",1163,"" "PLAN","Bailey Gate Station. Proposed junction at Corfe Mullen.","D",1049,"" "PLAN","Bailey Gate Stn. United Dairies proposed sisding facilities.","D",1159,"" "PLAN","Bailey Gate.","D",1160,"" "PLAN","Bailey Gate. Proposed water pipe.","D",1161,"" "PLAN","Bailey Gate. Signal Diagram.","D",2005,"" "PLAN","Bailey Gate. Signal diagram.","D",2049,"" "PLAN","Bason Bridge. Signal diagram and locking plan.","D",2063,"" "PLAN","Bath GWR","D",300,"" "PLAN","Bath OS sheet 112 1"":1mile 3rd. ed. 1907","D",6,"" "PLAN","Bath OS/electricity Green Park 1939","D",303,"" "PLAN","Bath OS/electricity Green Park 1939","D",301,"" "PLAN","Bath OS/electricity Junction 1939","D",304,"" "PLAN","Bath OS/electricity Victoria Works","D",302,"" "PLAN ","Bath Station Green Park Signal Box diagram n.d.","D",4789,"" "PLAN","Binegar & Bridges 65-66 2ch.:1""","D",111,"" "PLAN","Binegar & Radstock Widening. Bridge over B&NSR at 3m 69ch.","D",1003,"" "PLAN","Binegar. Original. Locking plan.","D",1193,"" "PLAN","Binegar. Signal diagram.","D",2028,"" "PLAN","Blandford & Webb, Ltd. Site plan re improvements to storage yards.","D",1070,"" "PLAN","Blandford 1"":40' 1921","D",24,"" "PLAN","Blandford Camp Railway.","D",1029,"" "PLAN","Blandford general plan.","D",1037,"" "PLAN","Blandford Milldown ground frame box 1918","D",30,"" "PLAN","Blandford Milldown sidings 1"":40' 1919","D",32,"" "PLAN","Blandford Milldown sidings 1918","D",31,"" "PLAN","Blandford Pond & Sons' shed 1:40' n.d.","D",27,"" "PLAN","Blandford Sewerage scheme. Crossings at bridges #196,198.","D",1034,"" "PLAN","Blandford Sewerage. Passing under bridges #196-7,199.","D",1035,"" "PLAN","Blandford Sewerage. Plan showing works outside borough boundary.","D",1069,"" "PLAN","Blandford Smart & Sons gas service 1"":40' n.d.","D",25,"" "PLAN","Blandford Station.","D",1030,"" "PLAN","Blandford Station. Partition in bookings and parcels office.","D",1074,"" "PLAN","Blandford Station. Proposed alterations to stores.","D",1032,"" "PLAN","Blandford Station. Proposed widening of East Street Bridge.","D",1040,"" "PLAN","Blandford tunnel to steam mills 1"":40' 1922","D",26,"" "PLAN","Blandford.","D",1031,"" "PLAN","Blandford.","D",1038,"" "PLAN","Blandford. Bridge #198. Fencing erected by Blandford Town Council.","D",1067,"" "PLAN","Blandford. General Plan.","D",1033,"" "PLAN","Blandford. Iron posts at end of Bridge #194.","D",1071,"" "PLAN","Blandford. Light Railway to Air Force Camp.","D",1043,"" "PLAN","Blandford. Plan of station.","D",1039,"" "PLAN","Blandford. Proposed widening of Damory Bridge.","D",1041,"" "PLAN","Blandford. Signal diagram.","D",2048,"" "PLAN","Blandford. Subway. Bridge #195.","D",1036,"" "PLAN","Blandford. Window overlooking railway at 51m 72ch.","D",1073,"" "PLAN","Boards Siding. Bridgewater. Diagram and locking plan.","D",2061,"" "PLAN","Boards Siding. Cossington. Diagram.","D",2062,"" "PLAN","Bournemouth and Poole Electric. Cable route at Canford Bottom.","D",1059,"" "PLAN","Bournemouth and Poole Electrics. Bridge #77 at Merley.","D",1058,"" "PLAN","Bournemouth Gas & Water Co. Blandford. Gas main over bridge.","D",1068,"" "PLAN","Bournemouth W Jct.Drawing#4.Engine shed,ironwork,bracing,stancheon","D",1191,"" "PLAN","Bournemouth W. Goods shed. Plan, elevations, and sections.","D",1132,"" "PLAN","Bournemouth W. Stn. improvements. Details of valence and urinals.","D",1131,"" "PLAN","Bournemouth West Jct. Drawing#1. Engine shed and block plan.","D",1188,"" "PLAN","Bournemouth West Jct. Drawing#2. Engine shed.","D",1189,"" "PLAN","Bournemouth West Jct. Drawing#3. Engine shed,hoppers,furnace,pits.","D",1190,"" "PLAN","Bournemouth West Stn. Drawings of exterior.","D",1130,"" "PLAN","Bournemouth West Stn. Improvements. Details of barrier and railing","D",1127,"" "PLAN","Bournemouth West Stn. Overhead plan.","D",1196,"" "PLAN","Bournemouth West Stn. Proposed improvements. Floor plans.","D",1128,"" "PLAN","Bournemouth West. Additions to station. Plans and elevations.","D",1129,"" "PLAN","Bournemouth West. Overhead view.","D",1197,"" "PLAN","Bournemouth West. Survey, cross-sections and overhead view.","D",1195,"" "PLAN","BR(SR) Ashcott Bridgwater Highbridge Wharf West Pennard sidings","D",44,"" "PLAN","BR(SR) Bath Radstock Masbury sidings","D",42,"" "PLAN","BR(SR) Emborough & Binegar sidings","D",41,"" "PLAN","BR(SR) Hamwood & Winsor Hill sidings","D",40,"" "PLAN","BR(SR) Highbridge sidings","D",43,"" "PLAN","BR(SR) Highbridge War Dept. sidings","D",45,"" "PLAN","BR(SR) NCB Chilcompton & Moorewood sidings","D",39,"" "PLAN","BR(SR) Radstock (Ludlow) Norton Hill Sidings","D",38,"" "PLAN","BR(SR)/S & D Glastonbury Aqueduct Level Crossing","D",55,"" "PLAN","BR(SR)/S & D Glastonbury petrol pump & tank","D",56,"" "PLAN","BR(WR)/S & D Glastonbury petrol bulk","D",57,"" "PLAN","BR(WR)/S & D Glastonbury water supply","D",54,"" "PLAN","Branksome Stn. Drawing#2.","D",1178,"" "PLAN","Branksome Stn. Drawing#3. Details to platform buildings.","D",1177,"" "PLAN","Branksome Stn. Drawing#4. Elevations and sections.","D",1179,"" "PLAN","Branksome Stn. Drawing#5. Columns to platform roofing.","D",1176,"" "PLAN","Branksome Stn. Drawing#6. Detail of platform roofing.","D",1184,"" "PLAN","Branksome Stn. Drawing#7. Details of booking hall.","D",1183,"" "PLAN","Branksome Stn. Drawing#8. Exits, stairs, and ticket clerk's office","D",1180,"" "PLAN","Branksome Stn. Drawing#9. Miscellaneous details.","D",1181,"" "PLAN","Bransksome Jct Stn. Alterations to cottages and station masters ho","D",1182,"" "PLAN","Bridge #156, Cattle Arch.","D",1169,"" "PLAN","Bridge #157, Cattle Arch.","D",1172,"" "PLAN","Bridge #159 (Henstridge) b/n Henstridge and Templecombe.","D",1020,"" "PLAN","Bridge #159 under TP road to Sherborne.","D",1171,"" "PLAN","Bridge #163 (King's Mill) at 22m.","D",1028,"" "PLAN","Bridge #167. Proposed concrete deck slab.","D",1013,"" "PLAN","Bridge #169 under public road at 21m 9ch.","D",1022,"" "PLAN","Bridge at Templecombe Jct. Sheet#1.","D",1174,"" "PLAN","Bridge at Templecombe Jct. Sheet#2.","D",1175,"" "PLAN","Bridge at Templecombe Station. Sheet #3.","D",1165,"" "PLAN","Bridge under railway at 0m 40ch.","D",1211,"" "PLAN","Bridge(#155), Public road, Temple Lane.","D",1168,"" "PLAN","Bridge(#235) over railway at 1m 4ch.","D",1206,"" "PLAN","Bridge(#236) over railway at 1m 15ch. Lamb's Green Lane.","D",1207,"" "PLAN","Bridge(#238) over railway at 1m 44ch.","D",1208,"" "PLAN","Bridges 68-69 2ch.:1""","D",112,"" "PLAN","Bridges over River Stour: Hodmoor,Fiddleford,Blandford. Girders.","D",1215,"" "PLAN","Bridgewater North. Signal plan.","D",2010,"" "PLAN","Bridgewater railway. Engine shed at Bridgewater 1887. copy","D",1255,"" "PLAN","Bridgewater railway. Goods shed at Bridgewater 1887. copy.","D",1254,"" "PLAN","Bridgewater railway. Goods shed at Edington. copy.","D",1259,"" "PLAN","Bridgewater railway. Goods shed at Edington- sketch. copy","D",1260,"" "PLAN","Bridgewater railway. Level crossing & lodge at Horsey Lane. copy.","D",1263,"" "PLAN","Bridgewater railway. Platform shelter at Edington-sketch. copy","D",1261,"" "PLAN","Bridgewater railway. Platform shelter at Edington. copy.","D",1262,"" "PLAN","Bridgewater railway. Proposed station building at Bridgewater 1886. copy.","D",1253,"" "PLAN","Bridgewater railway. Proposed wharf. copy","D",1257,"" "PLAN","Bridgewater railway. Station building at Cossington 1887. copy.","D",1250,"" "PLAN","Bridgewater railway. Station building at Edington Road 1890. copy","D",1258,"" "PLAN","Bridgewater railway. Station buildings at Cossington. copy.","D",1264,"" "PLAN","Bridgewater railway. Station master's house at Bridgewater. copy","D",1256,"" "PLAN","Bridgewater railway. Station yard at Bridgewater (sic) 1888. copy.","D",1252,"" "PLAN","Bridgewater railway. Station yard at Cossington n.d. 2 copies a,b (poor)","D",1251,"" "PLAN","Bridgwater engine shed roof covering BR n.d.","D",13,"" "PLAN","Bridgwater Railway goods Shed at Edington nd","D",800,"" "PLAN","Bridgwater Railway Platform Shelter at Edington nd","D",801,"" "PLAN","Bridgwater Railway sh prop formation Catcott-Bawdrip/Bridgwater nd","D",199,"" "PLAN","Bridgwater Railway Station Building at Edington Road Jan 3 1890","D",802,"" "PLAN","Bridgwater S & D with GWR 1"":2ch 1937","D",11,"" "PLAN","Broadstone Jct Stn. Plan, sections, and elevation.","D",1145,"" "PLAN","Broadstone Jct. Alteratons to waiting sheds on several platfroms.","D",1143,"" "PLAN","Broadstone Jct. Proposed new lavatories on up platform.","D",1144,"" "PLAN","Broadstone Jct. Proposed widening b/n Corfe Mullen and Broadstone","D",1046,"" "PLAN","Broadstone Junction.","D",1075,"" "PLAN","Broadstone.","D",1077,"" "PLAN","Bruton Road Crossing. Signal diagram.","D",2037,"" "PLAN","Burnham-on-Sea. Signal and Locking plans.","D",2001,"" "PLAN","Burnham-On-Sea. Signal diagram.","D",2065,"" "PLAN","Canford. Oakley Gates level crossing. Plan and section.","D",1192,"" "PLAN","Cattle Arch (#166) at 21m 45.5ch.","D",1027,"" "PLAN","Charlton Marshall. Occupation crossing near 53.75 mile post.","D",1154,"" "PLAN","Chilcompton & Binegar & Bridges 55-58 2ch.:1""","D",98,"" "PLAN","Chilcompton & Bridge 49 2ch.:1""","D",96,"" "PLAN","Chilcompton Station 2ch.:1""","D",97,"" "PLAN","Chilcompton. Locking plan.","D",2025,"" "PLAN","Chilcompton. Signal diagram.","D",2024,"" "PLAN","Cockmill Crossing. Diagram of signals. At 3m 4chs.","D",2055,"" "PLAN","Cole. Locking plan.","D",2039,"" "PLAN","Cole. Signal and Locking plans.","D",2003,"" "PLAN","Cole. Signal diagram.","D",2038,"" "PLAN","Combe Down Tunnel. Longitudinal Section.","D",1080,"" "PLAN","Corfe Mullen ballast pit 1:2500 1919","D",29,"" "PLAN","Corfe Mullen Jct. Signal Plan.","D",2006,"" "PLAN","Corfe Mullen Junction. Signal Diagram.","D",2051,"" "PLAN","Corfe Mullen. Proposed junction.","D",1044,"" "PLAN","Cossington Station. Ground frame and locking plan.","D",2058,"" "PLAN","County of Dorsert. Parish of Canford Magna. Plan of railway.","D",1061,"" "PLAN","Cross section in Combe Down tunnel.","D",1089,"" "PLAN","Damory Bridge Blandford","D",132,"" "PLAN","Details of main girders for trestle bridge. Re Radstock Coal Co.","D",1002,"" "PLAN","diagram of LSWR Inspection Engine 733 Drummond railmotor ¼"" to 1ft","D",148,"" "PLAN","Doubling between Binegar and Radstock. Culvert at 5m 58ch.","D",1004,"" "PLAN","Doubling of line south of Templecombe. Crossing at Stourpaine.","D",1051,"" "PLAN","Doulting Shepton Mallet Prestleigh viaduct & Bridges 93-95 2ch.:1""","D",119,"" "PLAN","Drawings of SDJR 0-6-0 probably made by Nick Ridgway 8mm to 1ft A4 sheets 1987","D",158,"" "PLAN","Eclipse Peat Works crossing 1:2500","D",73,"" "PLAN","Edington Junction. Locking plan.","D",2060,"" "PLAN","Edington Junction. Signal diagram.","D",2059,"" "PLAN","Elbow Corner Crossing. Ground frame.","D",2052,"" "PLAN","elevations Midford Signal Box 1936-1966 M J Arlett 1985","D",149,"" "PLAN","Emborough & Bridges 62-64 2ch.:1""","D",110,"" "PLAN","Emborough Stone Co.'s Windows 1"":8' n.d.","D",7,"" "PLAN","Evercreech Jct South. Original.","D",1186,"" "PLAN","Evercreech Jct. General arrangement. 56' diameter turntable.","D",1187,"" "PLAN","Evercreech Junction OS Sheet LIV9 1903 1:2500","D",312,"" "PLAN","Evercreech Junction North. Signal Diagram.","D",2035,"" "PLAN","Evercreech Junction South. Signal diagram.","D",2036,"" "PLAN","Evercreech New OS Sheet LIV5 1930 1:2500","D",311,"" "PLAN","Evercreech New. Locking diagram.","D",2034,"" "PLAN","Evercreech New. Signal diagram.","D",2033,"" "PLAN","Fiddleford bridge. Plan and elevation.","D",1216,"" "PLAN ","Fire mains and hydrants Highbridge Motive Power Depot October 1949","D",140,"" "PLAN","First class station house with residence.","D",1117,"" "PLAN","Foxcote (Shoscombe) Plan referred to nd folded","D",163,"" "PLAN","Girder bridge over river Lyddon near Stalbridge.","D",1016,"" "PLAN","Glastonbury rating n.d. paper copy","D",4701,"" "PLAN","Gradient diagram section of line Bath to Wimborne & Bournemouth","D",146,"" "PLAN","GWR timetable map n.d.","D",10,"" "PLAN","Henstridge cattle pen 1920","D",19,"" "PLAN","Henstridge Lady Guest's application 1:500 1917","D",18,"" "PLAN","Henstridge. (original) Rating plan","D",1133,"" "PLAN","Henstridge. Acetylene Corp.'s application to lay gas pipe.","D",1226,"" "PLAN","Henstridge. Drainage of station master's house and cottage.","D",1228,"" "PLAN","Highbridge A Signalbox A L Gray 4mm:1'","D",601,"" "PLAN","Highbridge GWR Signalbox A L Gray 4mm:1'","D",600,"" "PLAN","Highbridge rating 1932","D",33,"" "PLAN","Highbridge road bridge A L Gray 4mm:1'","D",602,"" "PLAN","Highbridge Station buildings Platforms 1 & 2 A L Gray 4mm:1'","D",604,"" "PLAN","Highbridge Waiting Room & Trolley Store Platform 5 A L Gray 4mm:1'","D",603,"" "PLAN","Highbridge Wharf (OPC)","D",69,"" "PLAN","Highbridge Wharf rating 1"":40' 1901","D",14,"" "PLAN","Hunslet 0-4-0 general arrangement 1931","D",400,"" "PLAN","Hunslet 0-4-0 motion arrangement n.d.","D",401,"" "PLAN","Huntspill Crossing. Signal diagram.","D",2069,"" "PLAN","Lamyatt Level Crossing 1:2500","D",72,"" "PLAN","Lighting of footbridge at Blandford.","D",1072,"" "PLAN","Line at Horsington near Templecombe.","D",1088,"" "PLAN","Line b/n Blandford & Shillingstone.","D",1056,"" "PLAN","LMS Arrangement of controls on Engine oil burning locos","D",410,"" "PLAN","LMS Arrangement of controls on Tender oil burning locos","D",411,"" "PLAN","LMS Arrangement of firepan oil burning locos","D",412,"" "PLAN","LMS Burner oil burning locos","D",413,"" "PLAN","LMS Diagram of lubrication points 4-6-0 passenger engine","D",420,"" "PLAN","LMS Stephenson Valve Gear 1946","D",421,"" "PLAN","LMS Whitaker Tablet Apparatus catcher for tender pc","D",423,"" "PLAN","LMS Whitaker Tablet Apparatus tender 1906 pc","D",422,"" "PLAN","LSWR General System map (2 copies) n.d.","D",8,"" "PLAN","Masbury & Bridges 70-72 2ch.:1""","D",113,"" "PLAN","Masbury Station, new waiting rooms, sketch. 24/9/1891. copy.","D",1231,"" "PLAN","Masbury. Ground frame.","D",2031,"" "PLAN","Masbury. Locking plan.","D",2030,"" "PLAN","Masbury. Signal diagram.","D",2029,"" "PLAN","May's Siding. Bath. Diagram of signals.","D",2012,"" "PLAN","Midford Ground Frame ""A"". Locking plan.","D",2013,"" "PLAN","Midford Ground Frame ""B"".","D",2016,"" "PLAN","Midford Station & Southstoke 2ch.:1""","D",74,"" "PLAN","Midford.","D",1185,"" "PLAN","Midford. Diagram of ""Sykes"" Locking. Locking plan. Track curcuits.","D",2014,"" "PLAN","Midford. Signal diagram.","D",2015,"" "PLAN","Midomer Norton. Diagram of signals.","D",2020,"" "PLAN","Midsomer Norton 2ch.:1""","D",95,"" "PLAN","Midsomer Norton station post-1966 OS/electricity","D",305,"" "PLAN","Midsomer Norton Upper. Ground frame.","D",2023,"" "PLAN","Midsomer Norton Upper. Locking plan.","D",2022,"" "PLAN","Midsomer Norton Upper. Signal diagram.","D",2021,"" "PLAN","Milldown, Blandford.","D",1042,"" "PLAN","Moorewood & Bridges 59-61 2ch.:1""","D",99,"" "PLAN","Moorewood Siding. Locking plan.","D",2027,"" "PLAN","Moorewood. Signal diagram.","D",2026,"" "PLAN","Mr. Bailward's apllication to lay 2"" water main under culvert 145.","D",1086,"" "PLAN","MR/S & D 2-8-0 general arrangement 5/7/39","D",58,"" "PLAN","MR/S & D 4-coupled passenger engine","D",59,"" "PLAN","MR/S & D 4-wheel bogie passenger engine","D",61,"" "PLAN","MR/S & D 6-wheel coupled goods engine","D",62,"" "PLAN","MR/S & D design for goods engine class B Jan.1874","D",63,"" "PLAN","MR/S & D outline for 3500 gallon tender","D",64,"" "PLAN","Occupation bridge at 0m 7furlongs.","D",1201,"" "PLAN","Occupation bridge(#165) at 21m 57.5ch.","D",1025,"" "PLAN","Occupation bridge(#168) at 21m 35ch.","D",1026,"" "PLAN","Occupation bridge(#232) at 0m 49ch.","D",1202,"" "PLAN","Occupation bridge(#232) at 0m 49ch.","D",1210,"" "PLAN","Occupation bridge(#234) at 0m 69.25ch.","D",1209,"" "PLAN","OS 6"" to 1 mile cloth Highbridge Burnham-on-Sea Brent Knoll Office of Supt of Road Transport GWR 1 Jan 1937","D",147,"" "PLAN","OS sheet L1.1 25"" to 1 mile Cossington 1904","D",1249,"" "PLAN","outline general arrangement S & D locomotives (20 diagrams)","D",65,"" "PLAN","Parish of Templecombe. County of Somerset.","D",1099,"" "PLAN","Polsham RP 2940 40' to 1"" Chief Engineer's Department traced from SDJR nd paper","D",4706,"" "PLAN","Poole Junction.","D",1076,"" "PLAN","Poole&Bournemouth Jct. Drawing #4. Bridge under railway at 0m 40ch","D",1203,"" "PLAN","Poole&Bournemouth Jct. Drawing #8. Culverts at 1m 28ch, 2m 45ch.","D",1204,"" "PLAN","Poole&Bournemouth Jct. Drawing#5. Bridge over railway at 1m 9ch.","D",1198,"" "PLAN","Poole&Bournemouth Jct. Drawing#6. Bridge over railway at 1m 15ch.","D",1199,"" "PLAN","Poole&Bournemouth Jct. Drawing#7. Bridge over railway at 1m 44ch.","D",1200,"" "PLAN","Poole&Bournemouth Jct. Drwing#9. Culvert at 1m 65.5ch.","D",1205,"" "PLAN","Poole&Bournemouth Jct. Proposed alteration of road at 1m 44chs","D",1153,"" "PLAN","Poole&Bournemouth Jct. Proposed alteration of roads at 1m 44ch.","D",1222,"" "PLAN","Proposed concrete deck slab for bridge #167.","D",1023,"" "PLAN","Proposed concrete deck slab for bridge #167.","D",1024,"" "PLAN","Proposed engine shed at Templecombe.","D",1085,"" "PLAN","Proposed strengthening of bridge #167.","D",1017,"" "PLAN","Proposed widening of line b/n Corfe Mullen and Broadstone Jct.","D",1047,"" "PLAN","Proposed widening of line b/n Shillingstone and Blandford.","D",1048,"" "PLAN","Proposed widening of line b/n Shillingstone and Blandford.","D",1050,"" "PLAN","Proposed widening of line b/n Stourpaine and Blandford.","D",1052,"" "PLAN","Protection Work on bridge #167 b/n Stalbridge & Sturminster Newton","D",1015,"" "PLAN","Pylle. Locking plan.","D",2053,"" "PLAN","Pylle. Signal and Locking plans.","D",2008,"" "PLAN","Pylle. Signal diagram.","D",2054,"" "PLAN","Radstock & Evercreech Jct. Stations. Details and plans of both.","D",1007,"" "PLAN","Radstock and Evercreech Junction Stations. Footbridges.","D",1000,"" "PLAN","Radstock North 'B'. Original.","D",1194,"" "PLAN","Radstock North B Signalbox diagram 1960","D",1,"" "PLAN","Radstock OS sheet 24151","D",4,"" "PLAN","Radstock OS/electricity","D",306,"" "PLAN","Radstock OS/electricity North Yard","D",307,"" "PLAN","Radstock OS/electricity West & North stations","D",309,"" "PLAN","Radstock OS/electricity West Yard","D",308,"" "PLAN","Radstock OS1/1250 1902/11","D",313,"" "PLAN","Radstock rating Bath-Evercreech sheet 14 n.d.","D",12,"" "PLAN","Radstock rating BR 1:500 1969","D",3,"" "PLAN","Radstock SJC & British Wagon Co. agreement 1910","D",5,"" "PLAN","Radstock Station. Subway, bridge #40.","D",1010,"" "PLAN","Radstock Station.Footbridge.","D",1001,"" "PLAN","Radstock. Lattice piers for Radstock trestle bridge.","D",1012,"" "PLAN","Radstock. Various bridges.","D",1008,"" "PLAN","rating Bruton Road Crossing & Bridges 113-114 Sh.37 June 1921 2ch.:1""","D",80,"" "PLAN","rating Charlton Musgrave & Bridges 129-130 Sh.42 June 1921 2ch.:1""","D",85,"" "PLAN","rating Charlton Musgrave Sh.43 June 1921 2ch.:1""","D",86,"" "PLAN","rating Cheriton & Bridges 142-145 Sh.47 Sept 1921 2ch.:1""","D",90,"" "PLAN","rating Cole & Bridges 119-123 Sh.39 June 1921 2ch.:1""","D",82,"" "PLAN","rating Common Lane Crossing & Bridge 156 Sh.50 Sept 1921 2ch.:1""","D",93,"" "PLAN","rating Evercreech & Bridges 97-99 2ch.:1""","D",77,"" "PLAN","rating Evercreech Junction & Bridges 108-111 Sh.35 1923 2ch.:1""","D",76,"" "PLAN","rating Evercreech New & Bridges 100-102 2ch.:1""","D",78,"" "PLAN","rating Henstridge & Bridges 158-159 Sh.51 Sept 1921 2ch.:1""","D",94,"" "PLAN","rating Lamyatt Crossing & Bridge 112 Sh.36 June 1921 2ch.:1""","D",79,"" "PLAN","rating Shepton Montague & Bridges 124-125 Sh.40 June 1921 2ch.:1""","D",83,"" "PLAN","rating Shepton Montague & Bridges 126-128 Sh.41 June 1921 2ch.:1""","D",84,"" "PLAN","rating Templecombe & Bridge 146 Horsington Sh.48 Sept 1921 2ch.:1""","D",91,"" "PLAN","rating Templecombe Station Sh.49 Sept 1921 2ch.:1""","D",92,"" "PLAN","rating Tucking Mill Viaduct & Bridges 103-107 2ch.:1""","D",75,"" "PLAN","rating Wincanton & Bridge 141 Sh.46 Sept 1921 2ch.:1""","D",89,"" "PLAN","rating Wincanton & Bridges 131-136 Sh.44 June 1921 2ch.:1""","D",87,"" "PLAN","rating Wincanton & Bridges 137-140 Sh.45 June 1921 2ch.:1""","D",88,"" "PLAN","rating Wyke Champflower & Bridges 115-118 Sh.38 June 1921 2ch.:1""","D",81,"" "PLAN","RCH map west of England 1918 (reprint 1969)","D",100,"" "PLAN","Relaying 195 Edington Junction nd","D",144,"" "PLAN","Renewal of bridge#167 over River Lyddon near Stalbridge.","D",1018,"" "PLAN","S & D (& others) Viaducts","D",36,"" "PLAN","S & D Clandown Tramway 1873","D",35,"" "PLAN","S & D J R alterations to brick arches G9BS boilers engines no 86-90 1928","D",413,"" "PLAN","S & D J R Bason Bridge","D",51,"" "PLAN","S & D J R Bason Bridge Catch Pit","D",52,"" "PLAN","S & D J R Burnham-on-Sea sewer","D",49,"" "PLAN","S & D J R Engineers Diagram 1st. March 1920","D",202,"" "PLAN","S & D J R Highbridge bungalow","D",47,"" "PLAN","S & D J R Highbridge Church Street level crossing","D",48,"" "PLAN","S & D J R Highbridge river west of Clyce 1941","D",50,"" "PLAN","S & D J R Highbridge sidings for military depot n.d.","D",46,"" "PLAN","S & D J R steel carriage bogie 1898 Highbridge Works","D",310,"" "PLAN","S & D Railwagon 6/3/03","D",60,"" "PLAN","S&D 4-wheel coupled bogie passenger engine + tender MR Derby April 1891 ¼"" to 1ft","D",143,"" "PLAN","S&DJR and connecting railways","D",1229,"" "PLAN","SCR longitudinal section Black Ditch-S.Drain Walton n.d.","D",200,"" "PLAN","Sections of culverts. Bridges#3010,3012-4,3003-4,3006.","D",1212,"" "PLAN","Shapwick. Signal and locking plans.","D",2009,"" "PLAN","Shepton Mallet & Bridges 74-75 2ch.:1""","D",114,"" "PLAN","Shepton Mallet & Bridges 80-83 2ch.:1""","D",116,"" "PLAN","Shepton Mallet & Bridges 89-92 2ch.:1""","D",118,"" "PLAN","Shepton Mallet Bridge 79 1:2500","D",70,"" "PLAN","Shepton Mallet Bridge 90 1:2500","D",71,"" "PLAN","Shepton Mallet Station & Bridges 85-88 2ch.:1""","D",117,"" "PLAN","Shillingstone hoardings 1:500 1919","D",22,"" "PLAN","Shillingstone Station and plan for ditch.","D",1217,"" "PLAN","Shillingstone Station.","D",1218,"" "PLAN","Shillingstone Station. Proposed extension of loop.","D",1219,"" "PLAN","Shillingstone window in parcels office 1917","D",23,"" "PLAN","Shillingstone. (original)","D",1135,"" "PLAN","Shillingstone. Application to lay water pipe under railway.","D",1221,"" "PLAN","Shillingstone. Cottage residence.","D",1213,"" "PLAN","Shillingstone. Line moving southeast.","D",1057,"" "PLAN","Shillingstone. Locking plan.","D",2047,"" "PLAN","Shillingstone. Offer of land to improve entrance to station.","D",1225,"" "PLAN","Shillingstone. Proposed 1.5"" water main.","D",1139,"" "PLAN","Shillingstone. Signal diagram. (S&DJR)","D",2046,"" "PLAN","Shillingstone. Signal diagram. (SR)","D",2045,"" "PLAN","Shillingstone. Signal plan.","D",2004,"" "PLAN","Siding for Alexander B/n Ashcott & Shapwick. Ground frame.","D",2067,"" "PLAN","signalling diagram Midford 1950 drawn by P E Cattermole for SDRT Bluebook 2","D",150,"" "PLAN","signalling Mangotfield North nd","D",2110,"" "PLAN","sketchbook Highbridge A L Gray","D",605,"" "PLAN","Somerset Coal Canal longitudinal Section annotated post 1907","D",2960,"" "PLAN","Somerset Construction Cos. & Colhurst.Symons Sidings. Ground frame","D",2064,"" "PLAN","Stalbridge Station.","D",1142,"" "PLAN","Stalbridge Station.","D",1223,"" "PLAN","Stalbridge Station. RE sewerage farm.","D",1141,"" "PLAN","Stalbridge. (original)","D",1136,"" "PLAN","Stalbridge. Diagram of Signals.","D",2040,"" "PLAN","Stalbridge. Locking plan.","D",2042,"" "PLAN","Stalbridge. Proposed gas main to agents house.","D",1138,"" "PLAN","Stalbridge. Signal diagram.","D",2041,"" "PLAN","Steanbow Crossing. Ground frame.","D",2056,"" "PLAN","Steanbow Crossing. Signal plan.","D",2007,"" "PLAN","Strengthening of Bridge#151 b/n Evercreech Jct. and Templecombe.","D",1173,"" "PLAN","Strengthening to bridge #167.","D",1021,"" "PLAN","Sturminster District Council. Sections of pipes over bridges#172-3","D",1220,"" "PLAN","Sturminster Newton and Stalbridge. Strengthening of bridge #167.","D",1014,"" "PLAN","Sturminster Newton pipe drain 1920","D",20,"" "PLAN","Sturminster Newton porters' room 1919","D",21,"" "PLAN","Sturminster Newton Station.","D",1214,"" "PLAN","Sturminster Newton. (original) Rating plan.","D",1134,"" "PLAN","Sturminster Newton. Decking and track to bridge#167.","D",1019,"" "PLAN","Sturminster Newton. Locking plan.","D",2043,"" "PLAN","Sturminster Newton. Signal diagram.","D",2044,"" "PLAN","Sturminster Newton. Water supply. Proposed mains over 2 bridges.","D",1137,"" "PLAN","Templecombe Jct. Proposed platform extension east end of station.","D",1084,"" "PLAN","Templecombe Junction. 50' diameter turntable 4'8.5"" gauge.","D",1079,"" "PLAN","Templecombe Junction. Engine Turntable 50' diameter.","D",1078,"" "PLAN","Templecombe OS sheet (photocopy) n.d.","D",9,"" "PLAN","Templecombe Station Reconstrucion. Buildings on downside.","D",1105,"" "PLAN","Templecombe Station Reconstruction. Details of buildings on upside","D",1104,"" "PLAN","Templecombe Station Reconstruction. Station Buildings on downside.","D",1106,"" "PLAN","Templecombe Station Yard. Showing proposed alterations to sidings.","D",1082,"" "PLAN","Templecombe Station. Air raid damage. Reinstatement of building.","D",1113,"" "PLAN","Templecombe Station. Fittings to refreshment room on downside plat","D",1111,"" "PLAN","Templecombe Station. Fittings to refreshment room on upside plat.","D",1112,"" "PLAN","Templecombe Station. Renewal of cast iron bridge.","D",1164,"" "PLAN","Templecombe Stn Reconstruction. Up and down side builidings.","D",1126,"" "PLAN","Templecombe Stn. Proposed improvements.","D",1122,"" "PLAN","Templecombe Stn. Reconstruction for Bridge #151.","D",1170,"" "PLAN","Templecombe Stn. Reconstruction. Elevations and sectins.","D",1125,"" "PLAN","Templecombe Stn. Revised plan for boiler house.","D",1115,"" "PLAN","Templecombe Stn. Shutter gates and nameplates.","D",1116,"" "PLAN","Templecombe Stn. Steelwork details & reconstruction of bridge #151","D",1166,"" "PLAN","Templecombe Stn. Upside staircase. Wall tiling and advert panels.","D",1114,"" "PLAN","Templecombe.","D",1087,"" "PLAN","Templecombe.","D",1098,"" "PLAN","Templecombe. (re D1101) Correspondence w/Mr. Roche on plan.","D",1102,"" "PLAN","Templecombe. Complaint re alleged contamination of well.","D",1100,"" "PLAN","Templecombe. Detailed requirements.","D",1124,"" "PLAN","Templecombe. Gas Works. Proposed new gas holder and tank.","D",1103,"" "PLAN","Templecombe. Land plan.","D",1091,"" "PLAN","Templecombe. New station buildings. Overhead view.","D",1118,"" "PLAN","Templecombe. New station buildings. X-sections and elevations.","D",1119,"" "PLAN","Templecombe. Overhead View pointing out water equipment.","D",1097,"" "PLAN","Templecombe. Overhead view.","D",1095,"" "PLAN","Templecombe. Plan for additional station. Island platform.","D",1123,"" "PLAN","Templecombe. Platform roofing. Drawing #3.","D",1108,"" "PLAN","Templecombe. Platform Roofing. Drawing #1.","D",1110,"" "PLAN","Templecombe. Portion of Mr.Bailward's farm occupied by Mr.Lock","D",1094,"" "PLAN","Templecombe. Proposed 3"" CI main from SW tank to S&D tank.","D",1092,"" "PLAN","Templecombe. Proposed siding north of #3 signal box. Site plan.","D",1083,"" "PLAN","Templecombe. Public footpaths over railway.","D",1090,"" "PLAN","Templecombe. Public road bridge (#152).","D",1167,"" "PLAN","Templecombe. S&D and LSWR crossing pointing out Mr. Gay's property","D",1101,"" "PLAN","Templecombe. Sewers.","D",1093,"" "PLAN","Templecombe. Steelwork for station buildings.","D",1120,"" "PLAN","Templecombe. Water Supply.","D",1096,"" "PLAN","Templecombe. Water Supply. Diagram of trial borings.","D",1081,"" "PLAN","Templecome Station Reconstruction. Licensing justices.","D",1107,"" "PLAN","Templecome Stn Reconstruction. Roof plan and up platform staircase","D",1121,"" "PLAN","Templecome. Platform roofing. Drawing #2.","D",1109,"" "PLAN","track Ashcott Writhlington Winsor Hill Cole Moorewood Hamwood","D",37,"" "PLAN","Twerton Siding. Diagram of signals.","D",2011,"" "PLAN","Unknown. Locking plan.","D",2068,"" "PLAN","Untitled survey near Shillingstone.","D",1227,"" "PLAN","Wellow Ground Frame. Signal diagram.","D",2018,"" "PLAN","Wellow rating n.d.","D",34,"" "PLAN","Wellow. Locking plan.","D",2017,"" "PLAN","West Pennard Cattle Pens Pencil Sketch 4' to 1"" nd inscr reverse 409 S & D","D",314,"" "PLAN","West Pennard sidings to foodstore","D",53,"" "PLAN","West Pennard. Signal and Locking plans.","D",2000,"" "PLAN","West Pennard. Signal diagram and locking plan.","D",2057,"" "PLAN","Widening b/n Binegar and Radstock. Occupation bridge at 4m 75.2ch.","D",1006,"" "PLAN","Widening b/n Binegar and Radstock. Plan of bridge over Welton Lane","D",1005,"" "PLAN","Widening b/n Blandford and Bailey Gate.","D",1054,"" "PLAN","Widening b/n Blandford and Bailey Gate.","D",1055,"" "PLAN","Widening Binegar to Radstock. Bridge (#41) over tramway.","D",1011,"" "PLAN","Widening Binegar to Radstock. Girders for bridges.","D",1009,"" "PLAN","Widening Blandford to Bailey Gate.","D",1045,"" "PLAN","Widening of line and junction b/n Corfe Mullen & Broadstone Jct.","D",1053,"" "PLAN","Wimborne Borough of Poole. Merley bridge(#78) re letter 10/11/33.","D",1155,"" "PLAN","Wimborne Jct. New Engine Shed. Drawing #2.","D",1062,"" "PLAN","Wimborne Jct. New Engine Shed. Drawing #1.","D",1064,"" "PLAN","Wimborne Jct. New Engine Shed. Drawing #3.","D",1065,"" "PLAN","Wimborne Jct. New Engine Shed. Drawing #4.","D",1066,"" "PLAN","Wimborne Junction Tank.","D",1063,"" "PLAN","Wimborne Junction. Bournemouth Gas & Water. Proposed 4"" gas main.","D",1151,"" "PLAN","Wimborne. Application from Poole Corp. to discharge into Co ditch.","D",1152,"" "PLAN","Wimborne. Application to errect gates in Co.'s fence.","D",1147,"" "PLAN","Wimborne. Dorset county council. Proposed new subway.","D",1156,"" "PLAN","Wimborne. Electric cable laid to Dorset farmer's warehouse.","D",1146,"" "PLAN","Wimborne. Flooding of roadway under Bridge #77.","D",1148,"" "PLAN","Wimborne. North Leigh bridge (#74). Method of fixing water main.","D",1149,"" "PLAN","Wimborne. Proposed alteration to parapet on Delph bridge (#78).","D",1157,"" "PLAN","Wimborne. Storage accomodation charges.","D",1060,"" "PLAN","Wimborne. Wimborne Minster and WWCO Ltd. Sketch of proposed main.","D",1150,"" "PLAN","Wincanton 1:500 1935","D",17,"" "PLAN","Wincanton Council. Proposed Henstridge sewerage line xing railway.","D",1140,"" "PLAN","Wincanton occupation level crossing 1:2500 1920","D",15,"" "PLAN","Wincanton yard 1:500 1920","D",16,"" "PLAN","Winsor Hill 2ch.:1""","D",115,"" "PLAN","Winsor Hill. Signal and Locking plans.","D",2002,"" "PLAN","Winsor Hill. Signal diagram.","D",2032,"" "PLAN","Writhlington & Braysdown BR 1:500 n.d.","D",2,"" "PLAN","Writhlington Colliery site plan reproduced from NCB 1:500 folded","D",164,"" "PLAN","Writhlington. Signal diagram.","D",2019,"" "PLAN S&DJR","Bason Bridge Station, proposed Agent's house 1901. copy.","D",1230,"" "PLAN S&DJR","Diagram of signals at Midford station 2/8/1892","D",2117,"" "PLAN S&DJR","Diagram of signals at Radstock West station 6/6/1894. copy","D",2118,"" "PLAN S&DJR","Diagram of signals at Wellow station 2/8/1892. copy","D",2114,"" "PLAN S&DJR","Diagrams of signals Wellow station 14/6/1894. copy","D",2113,"" "PLAN S&DJR","Masbury Station, new waiting rooms, copy.","D",1232,"" "PLAN S&DJR","Midford viaduct,centre for arch No8 over public rd.","D",2121,"" "PLAN S&DJR","New signal box Shapwick Station 1901. copy.","D",1235,"" "PLAN S&DJR","New Waiting Shed, Cole station 1877. cpoy.","D",1233,"" "PLAN S&DJR","Polsham Station buildings 1894 copy.","D",1234,"" "PLAN S&DJR","Shapwick Station, reconstruction 1901. copy.","D",1236,"" "PLAN S&DJR","Widening between Shepton Mallet & Binegar, Windsor hill sidings, diagram No 36","D",2111,"" "PLAN SCR","Smithy and Boiler house. copy","D",1300,"" "PLAN SCR","Stores and offices. copy.","D",1301,"" "PLAN (drwaing) SDJR","Bogie composite coach 2 firsts 4½ thirds 2 lavs & luggage 14/12/1899 Highbridge for nos 1-3 5 10-12 22 24-27 31 33 34 ","D",67,"" "PLAN (LSWR) SDJR","and agreement laying four inch pipe drain Eclipse Fuel Cos weighbridge at Highbridge Wharf 11/24 April 1914","D",154,"" "PLAN (set of foolscap diagrams)","Blandford to Poole plus Bournemouth West post 1966 showing line removals and rationalisations","D",145,"" "PLAN (SR) SDJR","Burnham Branch Colthurst & Symonds reinstatement of siding 14 January 1944","D",153,"" "PLAN BR","Exeter District Tool Vans & Cranes framed","D",3000,"" "PLAN BR (S&D)","drawing of numbers and classes of engines 1 Jan 1956 ","D",152,"" "PLAN BR(SR)","Henstridge signalling 26 June 1956","D",2103,"" "PLAN BR(SR)","Moorewood Siding signal diagram","D",2070,"" "PLAN BR(SR)","Templecombe Junction locking diagram 1958","D",2101,"" "PLAN BR(SR)","Templecombe Junction signalbox diagram 1958","D",2100,"" "PLAN BR(SR)","Templecombe Junction track showing circuits 1958","D",2102,"" "PLAN BR(WR)","Signalbox diagram Evercreech Junction North S448/12 30/6/65 uncoloured","D",2257,"" "PLAN BR(WR)","Signalbox diagram Evercreech Junction South S449/12 October 1956 uncoloured","D",2258,"" "PLAN BR(WR)","Western Division Feb 1963","D",220,"" "PLAN DCR","bound set of plans & sections session 1857 Blandford to Templecombe and Bruton with brances ex Eng Office Paddington","D",109,"" "PLAN LMS","Diagram Standard 0-6-0 Class 4 Superheated Freight Tender Engine Loco Publ Co Ltd coloured-up n.d.","D",2600,"" "PLAN LMSR","Bath Junction Signal Box Diagram n.d.","D",4788,"" "PLAN MR","Armstrong Whitworth 0-6-0 engine with Schmidt superheater Drawing no M49398 12 July 1921 Blueprint ","D",68,"" "PLAN MR","Armstrong Whitworth 3500 gallon tender Drawing no M47555 11 June 1921 Blueprint ","D",68,"a" "PLAN MR","Bath Bridge 42 1914 Contract drawing No 7","D",4771,"" "PLAN MR","Bath Bridge 42 4' to 1"" 5 Feb 1914","D",4770,"" "PLAN MR","Bath Bridge 43 Contract drawing 10 1914","D",4773,"" "PLAN MR","Bath Bridge 43 Contract drawing No 9","D",4772,"" "PLAN MR","Bath Bridge 44 cross sections 6/8/43","D",4782,"" "PLAN MR","Bath Bridge 44 pier site plan etc Contract drawing No 2","D",4781,"" "PLAN MR","Bath Bridge 44 proposed packing at pier 9/9/86","D",4784,"" "PLAN MR","Bath Bridge 44 reconstruction 24/9/37","D",4774,"" "PLAN MR","Bath Bridge 44 reconstruction December 1934 Contract drawing No 1","D",4775,"" "PLAN MR","Bath Bridge 44 sections 16/3/34","D",4783,"" "PLAN MR","Bath Bridge 44 temporary trestles Contract drawing No 3 1934","D",4776,"" "PLAN MR","Bath Bridge 444 reconstruction and strengthening 24/3/37 Contract drawing No 5","D",4780,"" "PLAN MR","Bath details of approach road to cab stand n.d.","D",4779,"" "PLAN MR","Bath mpd injury to F Nash and damage to steam crane 19 December 1951","D",4785,"" "PLAN MR","Bath proposed lifting of track over bridge No 44","D",4778,"" "PLAN MR","Bath showing sidings n.d.","D",4777,"" "PLAN MR","rating 1921. 2ch:1"". Wells, St. Cuthbert, including S+D station. WL1","D",1400,"" "PLAN MR","rating, 1921. 2ch:1"". Bor & Parish of Glastonbury W12","D",1445,"" "PLAN MR","rating, 1921. 2ch:1"". Bor & Parish of Glastonbury Cemetary La W13","D",1446,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Bruton. s37","D",1429,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Evercreech, including juncton. s35","D",1427,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Pitcombe and Bruton. s40","D",1430,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Pylle E Pennard & Pilton W5 4","D",1441,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Pylle Holt Farm. W6","D",1442,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Pylle. w4","D",1440,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of Shepton Montague. s41","D",1431,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of W Pennard incl Station W7","D",1443,"" "PLAN MR","rating, 1921. 2ch:1"". Parish of W Pennard W8","D",1444,"" "PLAN MR","rating, 1921. 2ch:1"". Parishes of Charlton Musgrove and Wincanton. s43","D",1433,"" "PLAN MR","rating, 1921. 2ch:1"". Parishes of Wincanton and Holton. s45","D",1435,"" "PLAN MR","rating, 1921. 2ch:1"".PAarish of Wincanton, including station. s44","D",1434,"" "PLAN MR","rating, 1921. 2ch:1"".Parish ofLamyatt. s36","D",1428,"" "PLAN MR","rating, 1921. 2ch:1"".Parishes of Shepton Montague and Charlton Mus.s42","D",1432,"" "PLAN MR","rating, 1922. 2ch:1"". Borough and Parish of Glastonbury. WL5","D",1404,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of Bath. Bath to Evercreech sheet 2. N2","D",1406,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of Midsomer Nortion, inc. Midsomer st.N17","D",1410,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of Monkton Coombe. N4","D",1408,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of South Stoke inc, Midford goods yard.N5","D",1409,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of St. Cuthbert, out Coxley Mill House.WL2","D",1401,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of St. Cuthbert, Wick Farm. WL3","D",1402,"" "PLAN MR","rating, 1922. 2ch:1"". Parish of St.Cuthbert, inc. polsham station. WL4","D",1403,"" "PLAN MR","rating, 1922. borough of Bath, Twerton. Bath to Evercreech sheet 1. N1","D",1405,"" "PLAN MR","rating, 1923. 2ch:1"". Chilcompton Parish including station. N19","D",1411,"" "PLAN MR","rating, 1923. 2ch:1"". Parish of Bath including Lyncombe House. N3","D",1407,"" "PLAN MR","rating, 1923. 2ch:1"". Parish of Doulting n31","D",1423,"" "PLAN MR","rating, 1923. 2ch:1"". Parish of Evercreech, including station. n33","D",1425,"" "PLAN MR","rating, 1923. 2ch:1"". Parish of Evercreech.n34","D",1426,"" "PLAN MR","rating, 1923. 2ch:1"". Parish of Shepton Mallet. n28","D",1420,"" "PLAN MR","rating, 1923. 2ch:1"". Parishes of Binegar and St. Cuthbert Wells. N23","D",1415,"" "PLAN MR","rating, 1923. 2ch:1"". Parishes of Dinder and Croscombe. n25","D",1417,"" "PLAN MR","rating, 1923. 2ch:1"".Parishes of Binegar and Emborough. N21","D",1413,"" "PLAN MR","rating, 1923. 2ch:1"".Parishes of St. Cuthbert Wells and Dinder. N24","D",1416,"" "PLAN MR","rating, 1923. 2ch:1. Parish of Shepton Mallet. n27","D",1419,"" "PLAN MR","rating, 1923. 2ch;1"". Parishes of Evercreech and Doulting n32","D",1424,"" "PLAN MR","rating, 1923. Parish of MidsommerNorton and Binegar. N20","D",1412,"" "PLAN MR","rating, 1923.2ch:1"".Parishes of Croscombe and Shepton Mullet. N26","D",1418,"" "PLAN MR","rating,1921. 2ch:1"". PArishes of Holton and North Cheriton. s46","D",1436,"" "PLAN MR","rating,1923. 2ch:1"". Parish of Binegar. N22","D",1414,"" "PLAN MR","rating,1923. 2ch;1"". Parish of Shepton Mallet and dDoulting. n30","D",1422,"" "PLAN MR","rating,1923.2ch:1"". Parish of Shepton Mallet including station. n29","D",1421,"" "PLAN MR","survey Bath-Evercreech Combe Down to Midford Aug 1922 2ch to 1"" paper","D",105,"" "PLAN MR","survey Bath-Evercreech Combe Down Tunnel Sheet 4 (?) Aug 1922 2ch to 1"" paper","D",104,"" "PLAN MR","survey Bath-Evercreech Lyncombe Sheet 2 Aug 1922 2ch to 1"" paper","D",102,"" "PLAN MR","survey Bath-Evercreech Lyncombe Sheet 3 Aug 1922 2ch to 1"" paper","D",103,"" "PLAN MR","survey Bath-Evercreech Twerton Sheet 1 Aug 1922 2ch to 1"" paper","D",101,"" "PLAN MR rating","Radstock Station 2ch to 1"" folded","D",162,"" "PLAN MR rating","Sheet 14 Glastonbury & Street Station ? June 1921","D",1477,"" "PLAN MR Rating","Sheet 15 Glastonbury Parish Aqueduct Crossing June 1921","D",1448,"" "PLAN MR rating","Sheet 16 Sharpham level crossing June 1921","D",1449,"" "PLAN MR rating","sheet 17 Walton & Meare parishes June 1921","D",1450,"" "PLAN MR rating","Sheet 18 Ashcott & Meare June 1921 ","D",1451,"" "PLAN MR rating","Sheet 19 Shapwick parish June 1921","D",1452,"" "PLAN MR rating","Sheet 20 Shapwick Station Jan 1922","D",1453,"" "PLAN MR rating","Sheet 21 Shapwick Parish Jan 1922","D",1454,"" "PLAN MR rating","Sheet 22 Catcott Jan 1922","D",1455,"" "PLAN MR rating","Sheet 23 Edington Jan 1922","D",1456,"" "PLAN MR rating","Sheet 24A Glastonbury Road Canal Jan 1922","D",1457,"" "PLAN MR Rating","Sheet 28 Bason Bridge Jan 1922","D",1458,"" "PLAN MR rating","Sheet 29 Huntspill Jan 1922","D",1459,"" "PLAN MR rating","Sheet 30 Highbridge Station ? Jan 1922","D",1460,"" "PLAN MR rating","Sheet 31 Highbridge North March 1922","D",1461,"" "PLAN MR rating","Sheet 32 Burnham Station ?1922","D",1462,"" "PLAN MR rating","Writhlington 2ch to 1"" September 1922","D",161,"" "PLAN MR/POOLEY","Foundations for weighing tables for Locomotive Engines","D",1382,"" "PLAN MR/POOLEY","Weighing table for Locomotive Engines for Highbridge signed SW Johnson 21/5/90","D",1381,"" "PLAN S & D J R","Highbridge rating 40' to 1""","D",606,"" "PLAN S&DJR","Diagram of signals and locking Writhlington and Braysdown 6/6/1894 copy","D",2112,"" "PLAN S&DJR","Diagram of signals at Binegar station (widening) 24/10 1892 copy","D",2116,"" "PLAN S&DJR","Diagram of signals at Masbury station (widening) 24/10/1892. copy","D",2120,"" "PLAN S&DJR","Diagram of signals at Radstock East station 6/6/1894. copy","D",2119,"" "PLAN S&DJR","Diagrams of signals at Shepton Mallet Station 24/10/1892 copy","D",2115,"" "PLAN SCR","Trimming and fitting shop","D",1302,"" "PLAN SCR extension Survey Section four plans","a Junction to W Pennard Parish b W Pennard Station to Glastonbury Parish c Cockmill Lane to West Pennard Station d Pylle Station to Cockmill Lane insc reverse B G Snow ","D",650,"" "PLAN SDJR","4-4-0 Passenger Engine 67 to 71 outline nd paper","D",174,"" "PLAN SDJR","Alteration to Brick Arches G9BS boilers engines No. 86-90 1928","D",413,"" "PLAN SDJR","Alterations to Highbridge station.Microfilm print. Date unclear","D",1316,"" "PLAN SDJR","Arrangements for switching out at Stourpaine No E81(318) Wimbledon 23.7.46","D",2220,"" "PLAN SDJR","Arrangements for switching out Stourpaine 22/6/05 (in LMS envelope Office copies ex Bath GP) ","D",2251,"d" "PLAN SDJR","Arrangements for switching out Stourpaine 9.2/05(in LMS envelope Office copies ex Bath GP) ","D",2252,"b" "PLAN SDJR","Bailey Gate Signals etc 14/8/08 removes brackets signals (in LMS envelope Office copies ex Bath GP) ","D",2249,"" "PLAN SDJR","Bath Road viaduct No 81 Reconstruction of arches 2,3,4 & 5 and piers 2,3,4 under up track 21.03.46 copy","D",4705,"" "PLAN SDJR","Blandford GF 11/6/1919 blueprint (in LMS envelope Office copies ex Bath GP) ","D",2251,"a" "PLAN SDJR","Blandford ground frame signal diagram No 381A FWAG 9.1.19 Wimbledon 16 June 1930","D",2222,"" "PLAN SDJR","Blandford Signals & locking 11/6/?19 blueprint (in LMS envelope Office copies ex Bath GP) ","D",2251,"b" "PLAN SDJR","Blandford Signals & locking 23/5/1913 blueprint (in LMS envelope Office copies ex Bath GP) ","D",2251,"c" "PLAN SDJR","Bridge No. 12. Micro film Print. Date unclear","D",1360,"" "PLAN SDJR","Bridge NO. 286 between Wells and Glastonbury. Microfilm print.Date unclear","D",1327,"" "PLAN SDJR","Bridge No.11 Microfilm Print.","D",1359,"" "PLAN SDJR","Bridge No.13 at 1m 73ch. Micrpfiom print. Date unclear.","D",1352,"" "PLAN SDJR","Bridge No.287 between Wells and Glastonbury. Microfilm print.Date unclear","D",1324,"" "PLAN SDJR","Bridges 286 and 287 between Glasonbury and Polsham. Microfilm print. Date?","D",1326,"" "PLAN SDJR","Bridgwater Railway Station Buildings at Cossington No 60","D",1265,"" "PLAN SDJR","Broadstone Junct MR estate 2ch to 1"" (in LMS envelope Office copies ex Bath GP) ","D",2246,"b" "PLAN SDJR","Broadstone Signals & locking 13/7/98 (in LMS envelope Office copies ex Bath GP) ","D",2246,"a" "PLAN SDJR","Coombe Down Tunnel. Microfilm Print. Date unclear","D",1354,"" "PLAN SDJR","Coombe down tunnel. Microfilm Print. Date unclear","D",1355,"" "PLAN SDJR","Corfe Mullen Junc Signals linen 23/4/1915 (in LMS envelope Office copies ex Bath GP) ","D",2248,"b" "PLAN SDJR","diagram of Bruton Road Crossing No 763/669 Wimbledon 18.2.36","D",2210,"" "PLAN SDJR","Diagrams of Engine Stock Highbridge 5 March 1930","D",170,"" "PLAN SDJR ","drawing of 40' 0¾"" Composite G R Weddell Drawing 26 March 1984","D",7002,"" "PLAN SDJR","Electrical locking & detection Templecombe No 2 Junc No 435B Wimbledon 12.1.1939","D",2212,"" "PLAN SDJR","Evercreech New Station Building n.d. post-closure ","D",7001,"" "PLAN SDJR","Extension to Bath and Somersetshire Coal Canal Co.- land required.","D",1364,"" "PLAN SDJR","Extension to Bath Bridge No.14 .Microfilm Print.","D",1353,"" "PLAN SDJR","Extension to Bath. Plan of road railway bridges over canal at Midford.","D",1365,"" "PLAN SDJR","Foundations for weighing tables for Locomotive Engines for Highbridge 23 June 1890 linen","D",1380,"" "PLAN SDJR","Gradients Wimborne Broadstone 9/4/23 Glastonbury drawing office (in LMS envelope Office copies ex Bath GP) ","D",2247,"b" "PLAN SDJR","Henstridge diagram of Signals etc 3/1/02 (in LMS envelope Office copies ex Bath GP) ","D",2256,"" "PLAN SDJR","Highbridge bridge No. 1229?. Microfilm print. date unknown","D",1311,"" "PLAN SDJR","Highbridge footbridge proposed reconstruction.Microfilm print.Date 15.10.27","D",1317,"" "PLAN SDJR","Highbridge footbridge. Microfilm print. date 11.8.1933","D",1315,"" "PLAN SDJR","Highbridge rating 40' to 1 inch nd","D",131,"" "PLAN SDJR","Highbridge station- sectional elevation.Microfilm print. Date unclear","D",1313,"" "PLAN SDJR","Highbridge station-footbridge. Microfilm print. date unknown","D",1312,"" "PLAN SDJR","Highbridge- new footbridge. Microfilm print, date unknown","D",1314,"" "PLAN SDJR","Home farm viaduct at 17m 12ch. Microfilm print. Date unclear","D",1340,"" "PLAN SDJR","Line & Gradient diagram branches Burnham Bridgwater Wells No 45 copy","D",176,"" "PLAN SDJR","Line and Gradient diagram Bath Bournemouth West No 44 2 copies ","D",175,"" "PLAN SDJR","Long Arch Bridge No.17. Microfilm print. date unclear","D",1357,"" "PLAN SDJR","Midford to Wellow widening over bridge at 19m 68ch. Bridge No. 21.","D",1310,"" "PLAN SDJR","Midford to Wellow. Accommodation bridge for Earl Temple at 21m 5ch. Date?","D",1366,"" "PLAN SDJR","Midford Viaduct at 3m 76ch, Microfilm print. DAte unclear","D",1362,"" "PLAN SDJR","Old River Brue stamped Glastonbury:5.8.20","D",65,"a" "PLAN SDJR","OS sheet LXXV.16 part 1930 Templecombe folded","D",160,"" "PLAN SDJR","Particulars of SDJR Engine Stock at Feb 1916 Blueprint 34*32","D",66,"" "PLAN SDJR","Pipe & Rod Arrangements S&D 2-8-0 LMS Derby paper copy folded","D",159,"" "PLAN SDJR","proposed closing of line Wimborne estimates plan 18/11/25 (in LMS envelope Office copies ex Bath GP) ","D",2247,"d" "PLAN SDJR","proposed doubling between Corfe Mullen & Broadstone estimates 20/11/25 (in LMS envelope Office copies ex Bath GP) ","D",2248,"c" "PLAN SDJR","Public Road Bridge at Templecombe Bridge No 162 nd","D",1240,"" "PLAN SDJR","Radstock 1:500 n.d. paper","D",4702,"" "PLAN SDJR","Radstock and Evercreech junction details of girders.Microfilm print.Date?","D",1320,"" "PLAN SDJR","Radstock and Evercreech Junction, details of girders. Microfilm print","D",1319,"" "PLAN SDJR","Radstock and Evercreech Junction,station,footbridges.Microfilm print.Date?","D",1318,"" "PLAN SDJR","Radstock bridge No.37 Microfilm print. date 7/1/1949","D",1349,"" "PLAN SDJR","rating Evercreech Junction Station 2ch to 1"" sheet 35 of Bath to Evercreech June 1923","D",1463,"" "PLAN SDJR","Reconstruction of bridge 287 betweenGlastonbury and Polsham. Microprint","D",1322,"" "PLAN SDJR","Reconstruction of bridge No. 287 between Glastonbury and Polsham Print","D",1321,"" "PLAN SDJR","Road Bridge over cutting at 24m28ch. Microfilm print. Date unknown","D",1358,"" "PLAN SDJR","Roadbridge over canal at Midford. Microfilm Print. Date unclear.","D",1361,"" "PLAN SDJR","S & D railway 13 & 14 Green Park Bath provision of local circuit to main circuit telephone 1926 no 86","D",2500,"" "PLAN SDJR","Section of bridge, Coxley, NO. 289. Microfilm print Date unclear","D",1323,"" "PLAN SDJR","Shepton Mallet n.d. paper","D",4703,"" "PLAN SDJR","Shillingstone diagram of signals etc 21/6/07 alterations to crossover (in LMS envelope Office copies ex Bath GP) ","D",2253,"" "PLAN SDJR","siding for Mr Alexander between Ashcott & Shapwick No 623 Wimbledon 16 June 1930","D",2232,"" "PLAN SDJR","Signal diagram Bailey Gate Crossing No 401 Wimbledon WTH 7.4.15 16 June 1930","D",2224,"" "PLAN SDJR","Signalling Instruction No 304 Blandford (in LMS envelope Office copies ex Bath GP) ","D",2251,"e" "PLAN SDJR","Signals and locking Highbridge B box No 372 annotated Wimbledon 16 June 1930","D",2241,"" "PLAN SDJR","Signals and locking Highbridge C box No 446 Wimbledon 16 June 1930","D",2240,"" "PLAN SDJR","Signals etc Apex Cos & Colthurst & Symons sidings No 723 Wimbledon 16 June 1930","D",2243,"" "PLAN SDJR","Signals etc Ashcott No 577 Wimbledon 16 June 1930","D",2231,"" "PLAN SDJR","Signals etc at Chilcompton No 501 Wimbledon June 1930","D",2200,"" "PLAN SDJR","Signals etc at Midsomer Norton No 502 Wimbledon 16 June 1930","D",2201,"" "PLAN SDJR","Signals etc at Moorewood Siding No 737 Wimbledon 16 June 1930","D",2202,"" "PLAN SDJR","Signals etc Bailey Gate No 380 Wimbledon 16 June 1930","D",2223,"" "PLAN SDJR","Signals etc Bason Bridge No 28 Wimbledon 25 February 1939","D",2238,"" "PLAN SDJR","Signals etc Bason Bridge Siding Wimbledon 16 June 1930","D",2239,"" "PLAN SDJR","Signals etc Blandford No 381 pencil annotations Wimbledon 20 Aug 1930","D",2221,"" "PLAN SDJR","Signals etc Board's Siding Bridgwater no 738 FWAG 23.4.14 Wimbledon 16 June 1930","D",2245,"" "PLAN SDJR","Signals etc Board's siding Cossington No 449 FWAG 23.4.14 Wimbledon 16 June 1930","D",2236,"" "PLAN SDJR","Signals etc Bridgwater No 52 Wimbledon 16 June 1930","D",2237,"" "PLAN SDJR","Signals etc Burnham No 44 Wimbledon nd","D",2242,"" "PLAN SDJR","Signals etc Cole No 68 Wimbledon 16 June 1930","D",2209,"" "PLAN SDJR","Signals etc Corfe Mullen Junction No 389A Wimbledon 28 June 1930","D",2225,"" "PLAN SDJR","Signals etc Corfe Mullen siding No 607 Wimbledon 16 June 1930","D",2226,"" "PLAN SDJR","Signals etc Cossington Station No 393 Wimbledon 28 June 1933","D",2235,"" "PLAN SDJR","Signals etc Edington Junction No 92 HDL 3.7.15 Wimbledon 16 June 1930","D",2234,"" "PLAN SDJR","Signals etc Evercreech Junc South No 100 pencil annotation Wimbledon 16 June 193","D",2206,"" "PLAN SDJR","Signals etc Evercreech Junc South No 762 Wimbledon 13.3.1925","D",2207,"" "PLAN SDJR","Signals etc Evercreech New FWAG 18.10.19 No 66 Wimbledon 16 June 1930","D",2208,"" "PLAN SDJR","Signals etc Evercreech North Junction No 465 Wimbledon 16 June 1930","D",2205,"" "PLAN SDJR","Signals etc Glastonbury No 500 Wimbledon 16 June 1930","D",2229,"" "PLAN SDJR","Signals etc Henstridge No 578 Wimbledon 16 June 1930","D",2214,"" "PLAN SDJR","Signals etc Pitts Siding (Highbridge) No 711 Wimbledon 16 June 1930","D",2244,"" "PLAN SDJR","Signals etc Polsham pencil annotations No 223 Wimbledon 16 June 1930","D",2230,"" "PLAN SDJR","Signals etc Pylle No 730 Wimbledon 16 June 1930","D",2227,"" "PLAN SDJR","Signals etc Shapwick No 503 Wimbledon 16 June 1930","D",2233,"" "PLAN SDJR","Signals etc Shepton Mallet No 367 Wimbledon 16 June 1930","D",2204,"" "PLAN SDJR","Signals etc Shillingstone No 457 Wimbledon 16 June 1930","D",2217,"" "PLAN SDJR","Signals etc Stalbridge No 366 pencil annotations Wimbledon 16 June 1930","D",2215,"" "PLAN SDJR","Signals etc Stourpaine No 635 Wimbledon 16 June 1930","D",2219,"" "PLAN SDJR","Signals etc Sturminster Newton No 388 Wimbledon 2 May 1932","D",2218,"" "PLAN SDJR","Signals etc Templecombe No 2 Junc No 435 Wimbledon 12.1.1939 drawn 1.2.33","D",2213,"" "PLAN SDJR","Signals etc West Pennard No 739 FWAG 14.9.17 Wimbledon 16 June 1930","D",2228,"" "PLAN SDJR","Signals etc Wincanton No 546 Wimbledon 16 June 1930","D",2211,"" "PLAN SDJR","Signals Wainwright & Co Siding Windsor Hill No 761 Wimbledon 16 June 1930","D",2203,"" "PLAN SDJR","Spetisbury Signals & locking 21/2/01(in LMS envelope Office copies ex Bath GP) ","D",2250,"" "PLAN SDJR","Stalbridge diagram of Signals etc 8/4/03 alterations to points etc (in LMS envelope Office copies ex Bath GP) ","D",2255,"" "PLAN SDJR","Stalbridge ground frame No 366A Wimbledon 16 June 1930","D",2216,"" "PLAN SDJR","Stourpaine diagram of Signals 16/6/05 (in LMS envelope Office copies ex Bath GP) ","D",2252,"a" "PLAN SDJR","Sturminster Newton Signals & locking 27/2/30 blueprint (in LMS envelope Office copies ex Bath GP) ","D",2254,"" "PLAN SDJR","Tucking Mill Viaduct near Midford station. Microfilm print. Date unclear","D",1351,"" "PLAN SDJR","Tucking Mill Viaduct near Midford station. Microfilm station. Date unclear","D",1356,"" "PLAN SDJR","Tynings incline bridge No. 37. Microfilm print. Date 17/11/?","D",1346,"" "PLAN SDJR","Tynings incline bridge No.37 between Radstock and Wellow. Microfilm print","D",1348,"" "PLAN SDJR","Tynings incline bridge. Radstock to wellow Microfilm Print. Date unclear","D",1350,"" "PLAN SDJR","Unnamed.Tynings incline bridge between Radstock and Wellow.Microfilm print","D",1347,"" "PLAN SDJR","WELLOW Viaduct, widening between Wellow and Midford. Microfilm print.","D",1328,"" "PLAN SDJR","Wellow viaduct, widening between Wellow and Midford. Microfilm print","D",1329,"" "PLAN SDJR","Wells 40' to 1"" RP No 3902 Chief Engineer's Dept Traced from SDJR plan n.d. paper","D",4704,"" "PLAN SDJR","Widening between Radstock and Wellow Cattle Creek at 19m 21ch. Microfilm","D",1333,"" "PLAN SDJR","Widening between Radstock and Wellow public road bridge at 18mil","D",1338,"" "PLAN SDJR","Widening between Radstock and wellow under bridge at 17m 48ch. Microfilm p","D",1339,"" "PLAN SDJR","Widening Midford to Wellow under bridge at 20m 70 ch. microfilm print","D",1367,"" "PLAN SDJR","Widening of the Line Bridge at Cole Bridge Bridge no 120 nd","D",1368,"" "PLAN SDJR","Widening of Wellow public road bridge at 6m53ch. Microfilm print.","D",1335,"" "PLAN SDJR","Widening Radstock to Wellow ""Thatcher"". Microfilm print. Date unclear","D",1334,"" "PLAN SDJR","Widening Radstock to Wellow at Penclinch at 16m 74ch. Microfilm print.","D",1342,"" "PLAN SDJR","Widening Radstock to Wellow overbridge at 8m 59ch. Microfilm print.13.1.84","D",1341,"" "PLAN SDJR","Widening Radstock to Wellow Public road bridgeat 18miles. Microfilm print","D",1337,"" "PLAN SDJR","Widening Radstock to Wellow Tynings incline bridge. Microfiolm print","D",1344,"" "PLAN SDJR","Widening Radstock to Wellow Tynings incline bridge. Microfilm print.","D",1345,"" "PLAN SDJR","Widening Radstock to Wellow Underbridge at 16m 45ch. Microfilm print.","D",1343,"" "PLAN SDJR","Widening Wellow to Midford under bridge at 19m 40ch. DAte 4,7,1891","D",1330,"" "PLAN SDJR","Widening Wellow To Midford under Bridge at 19m40ch DATE 23.7 1892","D",1331,"" "PLAN SDJR","Widening Wellow to Midford-details of Midford viaduct at 21m 58ch","D",1363,"" "PLAN SDJR","Widening Wellow To Midford. Bridge at 19m 40ch.Microfilm print.Date unclear","D",1332,"" "PLAN SDJR","Wimborne Junct 14 Nov 1925 signalling out of use Derby (in LMS envelope Office copies ex Bath GP) ","D",2247,"a" "PLAN SDJR","Wimborne MR estates 2ch to 1"" sheet 87 nd(in LMS envelope Office copies ex Bath GP) ","D",2247,"c" "PLAN SDJR (LMSR)","diagram of Engine Stock 31 Dec 1913 annotated [was 31 March 1921] (drawing office D 550)","D",66,"b" "PLAN SDJR (LMSR)","diagram of Engine Stock 31 Dec 1925 annotated to 1927 (drawing office D 1181)","D",66,"a" "PLAN SDJR various","letter to Mr Trigg ref bridge signals Corfe Mullen Junc 1980s (in LMS envelope Office copies ex Bath GP) ","D",2248,"a" "PLAN SR","details of Templecombe Platform Trolley 1965 Drwg No E1-15/16850","D",491,"" "PLAN SR","details of Templecombe Platform Trolley 1962 Drwg No E1-10/16851","D",492,"" "PLAN SR","details of Templecombe Platform Trolley 1962 Drwg No E1-10/16852","D",493,"" "PLAN SR","map of British Railways Southern Region 4 miles to 1"" 26 Feb 1957","D",130,"" "PLAN SR","Platform Parcel Barrow drwg E16874 1962","D",494,"" "PLAN SR","Sturminster Newton bridge No 175 tracing & paper copy","D",171,"" "PLAN SR","Templecombe Platform Trolley 1963 Drwg No E16849","D",490,"" "PLAN SR","Wellow signalling & locking diagram 1945","D",2071,"" "PLAN SR (SDJR)","Glastonbury 14 June 1939 removal of roofs and renewals of fences 40' to 1""","D",151,"" "PLAN SR (SDJR)","Signals etc Shillingstone 16/11/59 and 1962 annotated","D",2072,"" "PLAN SR (SDJR)","Stalbridge Goods Shed Accident to Porter H Tulk 18/5/36 tracing & paper copy","D",173,"" "PLAN SR (SDJR)","Sturminster Newton Proposed Store for Messrs Blandford & Webb 13.4.35 tracing & paper copy","D",172,"" "PLAN, S & D","Timekeeper's Office. Highbridge 4' to 1"" n.d. inscr reverse 333 S & D","D",610,"" "PLAN, S & D","Timekeeper's Office. Highbridge 4' to 1"" n.d. inscr reverse 248 S & D","D",611,"" "PLAN, S & D Railway extension","uniting the Midland Railway with the LSWR n.d. issued with prospectus","D",127,"" "PLAN, Track","Bath Green Park Station 1:2500 Southern Railways Group 1904 (4-73)","D",141,"" "PLANS","and map Bristol Motive Power Depots Area 22 incl Bath Radstock Templecombe Highbridge Wells (Bristol Suburban Railway Society)","D",155,"" "PLANS","set of drawings of S&D station layouts no scale A4 sheets","D",165,"" "PLANS","set of seven S&D line Wellow - Foxcote 2ch to 1"" - Sale Plans BR(WR) 19 March 1986","D",142,"" "PLANS and DRAWINGS SDJR","Milton/Yeomans collection - catalogued in detail separately - locomotives, rolling stock, carriages, Whitaker apparatus ","D",4000,"" "PLANS LMSR","Bath No 44 bridge Proposed closed-sleepered floor 2ft to 1 inch nd photocopy","D",157,"" "PLANS MR","Bath Engineer's Office Derby 1916 2ch to 1 inch two photocopies","D",156,"" "S & D","gradient diagram Feb 1917 (2)","D",201,"" "S&D","Bath to Masbury gradients, mounted on board and varnished? B12778","D",221,""